Complete SBS instructions: all application steps, options and notes.
C2 HARD™
Step–by-Step Application Instructions – C2 Hard - Burnished Before beginning, always read SDS and Product Data Sheet for complete instructions and safety information. Always prepare a test panel before proceeding.
SURFACE PREP BASED ON THE SURFACE CONDITION AND DESIRED FINISH
If necessary, grind the surface and finish with 200 resin diamonds. For better sheen finish with 400 resin diamonds.
Clean the surface well with water and auto scrubber.
If grinding is not necessary, clean the surface well with auto scrubber only and remove any oil spots.
Please refer to complete surface preparation for C2 Hard™ on our Product Data sheet.
C2 HARD™ AFTER SURFACE PREP
Shake C2 Hard™ well in packaging container.
Pre wet a microfiber mop with C2 Hard™ before application.
Apply C2 Hard™ using a spray applicator and evenly spread with microfiber mop in a swivel motion. Avoid over-application. Continue spray applying sufficient C2 Hard™ to maintain a wet edge with the microfiber pad. Best results are achieved when two people are used for application – one to spray the product while the other uniformly distributes the product. Refer to the Product Data Sheet for how to determine proper application rates.
Let the surface dry for a minimum of 15-30 minutes.
Burnish C2 Hard™ with a propane driven, high-speed burnisher along with an 800 diamond impregnated pad.
PLEASE NOTE:
- Do not over apply.
- Use ONLY neutral PH cleaner for maintenance. Recommended daily cleaning with C2 Clean™ and weekly use of, C2 Maintenance™ our lithium based cleaner.
- Please refer to the complete C2 Product application instruction available on our website at: www.cretecolors.com